Modeling stochastic project time-cost trade-offs with time-dependent activity durations
From MaRDI portal
Publication:440901
DOI10.1016/j.amc.2012.03.035zbMath1245.90078OpenAlexW2085339496MaRDI QIDQ440901
Xiaowei Chen, Hua Ke, Wei-Min Ma
Publication date: 19 August 2012
Published in: Applied Mathematics and Computation (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.amc.2012.03.035
Stochastic programming (90C15) Approximation methods and heuristics in mathematical programming (90C59)
Related Items
Cites Work
- Optimization models and a GA-based algorithm for stochastic time-cost trade-off problem
- Depedent-chance programming: A class of stochastic optimization
- Modelling stochastic decision systems using dependent-chance programming
- Uncertain programming: A unifying optimization theory in various uncertain environments
- Theory and practice of uncertain programming
- A bicriteria solid transportation problem with fixed charge under stochastic environment
- Project scheduling problem with stochastic activity duration times
- A genetic algorithm approach for the time-cost trade-off in PERT networks
- Chance-Constrained Programming
- Critical-Path Planning and Scheduling: Mathematical Basis
- Critical path planning under uncertainty
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- Solving the Project Time/Cost Tradeoff Problem Using the Minimal Cut Concept
- A Stochastic Branch-and-Bound Approach to Activity Crashing in Project Management
- A Simple CPM Time-Cost Tradeoff Algorithm