The EOQ with defective items and partially permissible delay in payments linked to order quantity derived algebraically
From MaRDI portal
Publication:441043
DOI10.1007/s10100-010-0160-9zbMath1245.90005OpenAlexW2001482670MaRDI QIDQ441043
Philip Shum, Chun-Tao Chang, Liang-Yuh Ouyang
Publication date: 20 August 2012
Published in: CEJOR. Central European Journal of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10100-010-0160-9
Related Items
An integrated inventory model with quality improvement and two-part credit policy, Economic order and production quantity models without constraint on the percentage of defective items, Novel solution method for inventory models with stochastic demand and defective units, Economic order quantity model for deteriorating items with planned backorder level, A loss-averse retailer-supplier supply chain model under trade credit in a supplier-Stackelberg game, Supplier–retailer inventory coordination with credit term for inventory‐dependent and linear‐trend demand, Unnamed Item, An alternative approach to solving cost minimization problem with Cobb-Douglas technology, Line-of-credit payment scheme and its impact on the retailer's ordering policy with inventory-level-dependent demand, A robust fuzzy approach for constrained multi-product economic production quantity with imperfect items and rework process
Cites Work
- Economic order quantity under conditionally permissible delay in payments
- Inventory models for defective items incorporating marketing decisions with variable production cost
- An EOQ model for deteriorating items under supplier credits linked to ordering quantity
- Optimal inventory policies involving variable lead time with defective items.
- An optimal solution of a general lot size inventory model with deteriorated and imperfect products, taking into account inflation and time value of money
- Optimal production run length and capital investment in quality improvement with an imperfect production process
- Economic Order Quantity under Conditions of Permissible Delay in Payments
- Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction
- Defective units in a continuous review (s, Q) system
- On the economic order quantity under conditions of permissible delay in payments
- Ordering Policies of Deteriorating Items under Permissible Delay in Payments
- Lot-sizing for a single-product recovery system with backordering