Parallel flowshop scheduling using Tabu search
From MaRDI portal
Publication:4474674
Recommendations
Cites work
- `` Strong NP-Completeness Results
- An improved branching scheme for the branch and bound procedure of schedulingnjobs onmparallel machines to minimize total weighted flowtime
- Defining tabu list size and aspiration criterion within tabu search methods
- General local search methods
- Optimal two- and three-stage production schedules with set-up time included
- Parallel machine scheduling with earliness and tardiness penalties
- Parallel machine scheduling, linear programming, and parameter list scheduling heuristics
- Scheduling Groups of Jobs on a Single Machine
- Scheduling of parallel identical machines to maximize the weighted number of just-in-time jobs
- Simulated annealing for parallel machine scheduling with earliness-tardiness penalties and sequence-dependent set-up times
- Two-machine flowshop scheduling with a secondary criterion
Cited in
(19)- A tabu search algorithm for the multi-stage parallel machine problem with limited buffer capacities.
- Performance evaluation of a parallel tabu search task scheduling algorithm
- Parallel machine scheduling with tool loading
- Parallel machine selection and job scheduling to minimize machine cost and job tardiness
- A fully polynomial time approximation scheme for scheduling on parallel identical two-stage openshops
- An effective Benders decomposition algorithm for solving the distributed permutation flowshop scheduling problem
- Solving a job-shop scheduling problem based on a tabu search algorithm
- Scheduling flexible manufacturing cells using tabu search
- A parallel tabu search for solving the primal buffer allocation problem in serial production systems
- Approximation algorithms for the parallel flow shop problem
- scientific article; zbMATH DE number 2159396 (Why is no real title available?)
- An extensive tabu search algorithm for solving the lot streaming problem in a job shop environment
- A review and classification on distributed permutation flowshop scheduling problems
- The distributed no-idle permutation flowshop scheduling problem with due windows
- Fifty years of research in scheduling -- theory and applications
- Advanced metaheuristics for bi-criteria optimization in a distributed blocking flow shop problem with setup times
- An efficient polynomial-time approximation scheme for parallel multi-stage open shops
- Logic-based benders decomposition methods for the distributed permutation flow shop scheduling problem with production and transportation cost
- Efficient heuristics for the weighted tardiness distributed permutation flowshop scheduling problem
This page was built for publication: Parallel flowshop scheduling using Tabu search
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4474674)