Job shop scheduling considering material handling
From MaRDI portal
Publication:4496995
DOI10.1080/002075499191120zbMath0948.90509OpenAlexW2115810398MaRDI QIDQ4496995
No author found.
Publication date: 21 August 2000
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/002075499191120
Related Items (4)
An improved particle swarm optimization with decline disturbance index (DDPSO) for multi-objective job-shop scheduling problem ⋮ Integrated production and material handling scheduling using mathematical programming and constraint programming ⋮ Integrated scheduling of handling equipment at automated container terminals ⋮ A hybrid GA/heuristic approach to the simultaneous scheduling of machines and automated guided vehicles
This page was built for publication: Job shop scheduling considering material handling