Job shop scheduling considering material handling
From MaRDI portal
(Redirected from Publication:4496995)
Recommendations
- Minimizing production flow time in a process and assembly job shop
- A perspective on job assignments under varying scheduled maintenance scenarios
- Single hoist cyclic scheduling with multiple tanks: A material handling solution
- Performance of decomposition procedures for job shop scheduling problems with bottleneck machines
- A simulated multi-objective model for flexible job shop transportation scheduling
Cited in
(8)- Practical job shop scheduling
- Integrated production and material handling scheduling using mathematical programming and constraint programming
- A grasp for job shop scheduling
- An improved particle swarm optimization with decline disturbance index (DDPSO) for multi-objective job-shop scheduling problem
- A hybrid GA/heuristic approach to the simultaneous scheduling of machines and automated guided vehicles
- A new approach to finite scheduling
- A perspective on job assignments under varying scheduled maintenance scenarios
- Integrated scheduling of handling equipment at automated container terminals
This page was built for publication: Job shop scheduling considering material handling
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4496995)