Scheduling with shutdowns and sequence dependent set-up times
From MaRDI portal
Publication:4497004
DOI10.1080/002075499191184zbMATH Open0948.90510OpenAlexW2141196819MaRDI QIDQ4497004FDOQ4497004
Authors:
Publication date: 21 August 2000
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/002075499191184
Recommendations
- Earliness-tardiness scheduling with setup considerations
- Job shop scheduling with setup times, deadlines and precedence constraints
- A branch and bound algorithm of the single machine schedule with sequence dependent setup times for minimizing total tardiness
- A multicriteria scheduling with sequence-dependent setup times
- Dominance rules for single machine schedule with sequence dependent setup and due date
Cited In (5)
- Decision support and optimization in shutdown and turnaround scheduling
- Single-machine past-sequence-dependent setup times scheduling with resource allocation and learning effect
- A survey of scheduling problems with setup times or costs
- A beam search heuristic for scheduling a single machine with release dates and sequence dependent setup times to minimize the makespan
- Scheduling to minimize the sum of weighted flowtime and weighted tardiness of jobs in a flowshop with sequence-dependent setup times.
This page was built for publication: Scheduling with shutdowns and sequence dependent set-up times
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4497004)