Job shop scheduling with a non-regular objective: A comparison of neighbourhood structures based on a sequencing/timing decomposition
From MaRDI portal
Publication:4497007
DOI10.1080/002075499190969zbMATH Open0949.90530OpenAlexW2103575349MaRDI QIDQ4497007FDOQ4497007
Authors: Paolo Brandimarte, M. Maiocco
Publication date: 21 August 2000
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/002075499190969
Recommendations
- A neighborhood for complex job shop scheduling problems with regular objectives
- The job shop scheduling problem with convex costs
- A linear programming-based method for job shop scheduling
- The Shifting Bottleneck Procedure for Job Shop Scheduling
- Approximative procedures for no-wait job shop scheduling.
Cited In (7)
- Dynamic scheduling for complex engineer-to-order products
- Scheduling satellite launch missions: an MILP approach
- A reduced variable neighborhood search for the just in time job shop scheduling problem with sequence dependent setup times
- A neighborhood for complex job shop scheduling problems with regular objectives
- A general approach for optimizing regular criteria in the job-shop scheduling problem
- Title not available (Why is that?)
- The job shop scheduling problem with convex costs
This page was built for publication: Job shop scheduling with a non-regular objective: A comparison of neighbourhood structures based on a sequencing/timing decomposition
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4497007)