Workshop scheduling using practical (inaccurate) data Part 1: The performance of heuristic scheduling rules in a dynamic job shop environment using a rolling time horizon approach
From MaRDI portal
Publication:4497170
DOI10.1080/002075499189835zbMath0949.90603MaRDI QIDQ4497170
No author found.
Publication date: 21 August 2000
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/002075499189835
90B30: Production models
Related Items
Using dispatching rules for job shop scheduling with due date-based objectives, Comparative performance analysis of a flexible manufacturing system (FMS): a review-period-based control, Executing production schedules in the face of uncertainties: a review and some future directions, A theoretic and practical framework for scheduling in a stochastic environment, A survey of dynamic scheduling in manufacturing systems, Aversion scheduling in the presence of risky jobs, Issues and opportunities regarding replanning and rescheduling frequencies, Adaptive scheduling and tool flow control in flexible job shops