A note on 'deliberately slowing down output in a family production context'
From MaRDI portal
(Redirected from Publication:4497187)
Recommendations
- Economic lot scheduling problem with imperfect production processes
- Economic Production Lot Size Model with Variable Production Rate and Imperfect Quality
- Economic lot scheduling problem with imperfect production processes and setup times
- Reduced production rates in the economic lot scheduling problem
- Scheduling economic lot sizes in deteriorating production systems
Cited in
(9)- The impact of controllable production rates on the performance of inventory systems: a systematic review of the literature
- Low carbon inventory model for vendor-buyer system with hybrid production and adjustable production rate under stochastic demand
- The economic production lot size model extended to include more than one production rate
- Economic lot scheduling problem with imperfect production processes
- Batch sizing with controllable production rates
- The use of minor setups within production cycles to improve product quality and yield
- Accounting for idle capacity cost in the scheduling of economic lot sizes
- Sustainable inventory management with hybrid production system and investment to reduce defects
- An optimal common production cycle time for imperfect production processes with scrap
This page was built for publication: A note on 'deliberately slowing down output in a family production context'
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4497187)