scientific article; zbMATH DE number 1757970
From MaRDI portal
Publication:4537758
Recommendations
- Complexity of preemptive minsum scheduling on unrelated parallel machines
- Minimizing the number of late jobs on unrelated machines
- The NP-completeness of the \(n/m/parallel/C_{\max}\) preemptive due-date scheduling problem
- Preemptive scheduling in a two-stage multiprocessor flow shop is NP-hard
- On the complexity of preemptive open-shop scheduling problems
Cited in
(16)- How useful are preemptive schedules?
- Scheduling divisible loads with time and cost constraints
- Unary NP-hardness of preemptive scheduling to minimize total completion time with release times and deadlines
- A note on \({\mathbb {NP}}\)-hardness of preemptive mean flow-time scheduling for parallel machines
- Preemptive scheduling on uniformly related machines: minimizing the sum of the largest pair of job completion times
- Designing PTASs for MIN-SUM scheduling problems
- Faster algorithms for semi-matching problems
- Power of preemption for minimizing total completion time on uniform parallel machines
- A note on the paper ``Minimizing total tardiness on parallel machines with preemptions
- Preemptive parallel-machine scheduling with a common server to minimize makespan
- Complexity of preemptive minsum scheduling on unrelated parallel machines
- The NP-completeness of the \(n/m/parallel/C_{\max}\) preemptive due-date scheduling problem
- On the complexity of scheduling unrelated parallel machines with limited preemptions
- A scheduling framework for distributed key-value stores and its application to tail latency minimization
- Minimizing the number of late jobs on unrelated machines
- Non-identical parallel-machine scheduling research with minimizing total weighted completion times: models, relaxations and algorithms
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4537758)