scientific article; zbMATH DE number 1766736
From MaRDI portal
Publication:4538152
DOI10.1016/S0453-4514(99)80021-0zbMATH Open0998.90041OpenAlexW4237859924MaRDI QIDQ4538152FDOQ4538152
Authors: Toshio Hamada, Mitsushi Tamaki
Publication date: 11 July 2002
Published in: Journal of the Operations Research Society of Japan (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0453-4514(99)80021-0
Title of this publication is not available (Why is that?)
Recommendations
- A Bayesian Sequential Single Machine Scheduling Problem to Minimize the Expected Weighted Sum of Flowtimes of Jobs with Exponential Processing Times
- Job scheduling to minimize expected weighted flowtime on uniform processors
- Stochastic scheduling on two non-identical parallel processors
- Scheduling jobs with exponential processing times on parallel machines
- Preemptive Scheduling of Stochastic Jobs with a Two-Stage Processing Time Distribution on M + 1 Parallel Machines
Cited In (2)
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4538152)