Dynamics of Two- and Three-Worker “Bucket Brigade” Production Lines
From MaRDI portal
Publication:4545688
DOI10.1287/opre.47.3.488zbMath1014.90027MaRDI QIDQ4545688
Leonid A. Bunimovich, John J. III Bartholdi, Donald D. Eisenstein
Publication date: 15 August 2002
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://semanticscholar.org/paper/c8b78c54939ee612f44d8d236a45fab4c3703779
90B30: Production models
Related Items
Performance of serial assembly line designs under unequal operator speeds and learning, Bucket brigades revisited: are they always effective?, Dynamics of 2-worker bucket brigade assembly line with blocking and instantaneous walk-back, Design and control of warehouse order picking: a literature review, Bucket brigades with worker learning, On the introduction of an agile, temporary workforce into a tandem queueing system, Bucket brigades on in-tree assembly networks, Optimal dynamic assignment of a flexible worker on an open production line with specialists, Corrective maintenance through dynamic work allocation and pre-emption: case study and application