A revision of some single-machine and m-machine flowshop scheduling problems with learning considerations
From MaRDI portal
Publication:454887
DOI10.1016/J.INS.2011.10.003zbMATH Open1259.90041OpenAlexW2065398190MaRDI QIDQ454887FDOQ454887
Authors: Ji-Bo Wang, Yu-Bin Wu, Ping Ji
Publication date: 10 October 2012
Published in: Information Sciences (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ins.2011.10.003
Recommendations
- A revision of machine scheduling problems with a general learning effect
- Note on ``Single-machine and flowshop scheduling with a general learning effect model and ``Some single-machine and m-machine flowshop scheduling problems with learning considerations
- Machine scheduling problems with a general learning effect
- Some scheduling problems with sum-of-processing-times-based and job-position-based learning effects
- Some single-machine and \(m\)-machine flowshop scheduling problems with learning considerations
Cites Work
- Title not available (Why is that?)
- Flow-shop scheduling with a learning effect
- Some single-machine and \(m\)-machine flowshop scheduling problems with learning considerations
- Note on ``Single-machine and flowshop scheduling with a general learning effect model and ``Some single-machine and m-machine flowshop scheduling problems with learning considerations
Cited In (12)
- Parallel-machine scheduling to minimize makespan with fuzzy processing times and learning effects
- Some results of the worst-case analysis for flow shop scheduling with a learning effect
- Four single-machine scheduling problems involving due date determination decisions
- Single machine group scheduling with time dependent processing times and ready times
- Scheduling identical jobs on uniform parallel machines under position-based learning effects
- Single machine past-sequence-dependent delivery times scheduling with general position-dependent and time-dependent learning effects
- Note on ``Single-machine and flowshop scheduling with a general learning effect model and ``Some single-machine and m-machine flowshop scheduling problems with learning considerations
- Single machine scheduling with general time-dependent deterioration, position-dependent learning and past-sequence-dependent setup times
- Unrelated parallel-machine scheduling with deteriorating maintenance activities to minimize the total completion time
- Note on a single-machine scheduling problem with sum of processing times based learning and ready times
- A note on ``Single-machine scheduling problems with both deteriorating jobs and learning effects
- Scheduling problems with past-sequence-dependent setup times and general effects of deterioration and learning
This page was built for publication: A revision of some single-machine and \(m\)-machine flowshop scheduling problems with learning considerations