Confidence Sets for the Date of a Structural Change at the End of a Sample
From MaRDI portal
Recommendations
- Confidence Sets in Change-Point Problems
- A modified confidence set for the structural break date in linear regression models
- Confidence sets for the date of a single break in linear time series regressions
- Consistent testing for structural change at the ends of the sample
- scientific article; zbMATH DE number 4109849
- Improved confidence sets for the date of a structural break
- Confidence sets for the break date based on optimal tests
- Confidence sets for the date of a break in level and trend when the order of integration is unknown
- Likelihood-ratio-based confidence sets for the timing of structural breaks
- Improving the length of confidence sets for the date of a break in level and trend when the order of integration is unknown
Cited in
(8)- Improving the length of confidence sets for the date of a break in level and trend when the order of integration is unknown
- Confidence sets for the date of a break in level and trend when the order of integration is unknown
- Confidence sets for the date of a single break in linear time series regressions
- Likelihood-ratio-based confidence sets for the timing of structural breaks
- Confidence sets for the break date based on optimal tests
- A modified confidence set for the structural break date in linear regression models
- Improved confidence sets for the date of a structural break
- Testing for changes in linear models using weighted residuals
This page was built for publication: Confidence Sets for the Date of a Structural Change at the End of a Sample
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4556514)