A min-flow algorithm for minimal critical set detection in resource constrained project scheduling
DOI10.1016/J.ARTINT.2011.12.001zbMATH Open1248.90051OpenAlexW2028327036MaRDI QIDQ456733FDOQ456733
Michele Lombardi, Michela Milano
Publication date: 16 October 2012
Published in: Artificial Intelligence (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.artint.2011.12.001
Recommendations
- Solving project scheduling problems by minimum cut computations
- Solving resource-constrained project scheduling problems by a* search
- scientific article; zbMATH DE number 4197725
- A branch and bound algorithm for the resource-constrained project scheduling problem
- An exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relations
constraint programmingconstraint-based schedulingmin-flow algorithmminimal critical setprecedence constraint posting
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35)
Cites Work
- PSPLIB -- a project scheduling problem library
- Theoretical Improvements in Algorithmic Efficiency for Network Flow Problems
- Temporal constraint networks
- Algorithmic graph theory and perfect graphs
- Constraint-based scheduling: Applying constraint programming to scheduling problems.
- Resource-constrained project scheduling: Notation, classification, models, and methods
- A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags
- Title not available (Why is that?)
- Preselective strategies for the optimization of stochastic project networks under resource constraints
- Algorithmic approaches to preselective strategies for stochastic scheduling problems
- Principles and Practice of Constraint Programming – CP 2004
- A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations
- A constraint-based method for project scheduling with time windows
- From precedence constraint posting to partial order schedules. A CSP approach to robust scheduling
- Incremental computation of resource-envelopes in producer-consumer models
Cited In (3)
Uses Software
This page was built for publication: A min-flow algorithm for minimal critical set detection in resource constrained project scheduling
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q456733)