Single machine bicriteria scheduling with equal-length jobs to minimize total weighted completion time and maximum cost
From MaRDI portal
Publication:457296
DOI10.1007/S10288-013-0244-1zbMATH Open1334.90051OpenAlexW1977916582MaRDI QIDQ457296FDOQ457296
Authors: Cheng He, Hao Lin, Xiumei Wang
Publication date: 26 September 2014
Published in: 4OR (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10288-013-0244-1
Recommendations
- Bicriteria scheduling on a series-batching machine to minimize makespan and total weighted completion time with equal length job
- Bicriterion Pareto‐scheduling of equal‐length jobs on a single machine related to the total weighted late work
- scientific article; zbMATH DE number 52239
- Minimizing total weighted tardiness for scheduling equal-length jobs on a single machine
- A Single Machine Bicriterion Scheduling Problem and an Optimizing Branch-and-Bound Procedure
- Bicriteria scheduling of equal length jobs on uniform parallel machines
- A bicriteria approach to minimize maximal lateness and resource consumption for scheduling a single machine
- A single-machine bicriterion scheduling problem with setup times
- Bicriterion Single Machine Scheduling with Resource Dependent Processing Times
- scientific article; zbMATH DE number 1149801
Multi-objective and goal programming (90C29) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Optimal Sequencing of a Single Machine Subject to Precedence Constraints
- Multicriteria scheduling problems: a survey
- Multicriteria scheduling
- Title not available (Why is that?)
- Single-Machine Scheduling to Minimize a Function of Two or Three Maximum Cost Criteria
- Minimizing total completion time and maximum cost simultaneously is solvable in polynomial time
Cited In (5)
- A note on competing-agent Pareto-scheduling
- Bi-criteria Pareto-scheduling on a single machine with due indices and precedence constraints
- Minimizing total completion time and maximum cost simultaneously is solvable in polynomial time
- Bicriteria Scheduling on a Single Batching Machine with Transportation and Deterioration to Minimize Total Completion Time and Production Costs
- Pareto optimal algorithms for minimizing total (weighted) completion time and maximum cost on a single machine
This page was built for publication: Single machine bicriteria scheduling with equal-length jobs to minimize total weighted completion time and maximum cost
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q457296)