Tactical Production and Lot Size Planning with Lifetime Constraints: A Comparison of Model Formulations
From MaRDI portal
Publication:4595321
DOI10.1142/S0217595917500191zbMath1379.90002OpenAlexW2733382332MaRDI QIDQ4595321
Andrea Raiconi, Stefan Voß, Julia Pahl, Raffaele Cerulli, Monica Gentili
Publication date: 30 November 2017
Published in: Asia-Pacific Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1142/s0217595917500191
Uses Software
Cites Work
- Unnamed Item
- Integrating deterioration and lifetime constraints in production and supply chain planning: a survey
- The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times
- Meta-heuristics for dynamic lot sizing: a review and comparison of solution approaches
- Lot-size models with backlogging: Strong reformulations and cutting planes
- Mixed integer programming model formulations for dynamic multi-item multi-level capacitated lotsizing
- A linear description of the discrete lot-sizing and scheduling problem
- Capacitated lot-sizing with sequence dependent setup costs
- Simultaneous lotsizing and scheduling by combining local search with dual reoptimization
- Dynamic Economic Lot Size Model with Perishable Inventory
- Modelling Practical Lot-Sizing Problems as Mixed-Integer Programs
- bc — prod: A Specialized Branch-and-Cut System for Lot-Sizing Problems
- Period Decompositions for the Capacitated Lot Sizing Problem with Setup Times
- Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction
- Strong Formulations for Multi-Item Capacitated Lot Sizing
- Solving Multi-Item Capacitated Lot-Sizing Problems Using Variable Redefinition
- Deterministic Production Planning: Algorithms and Complexity
- Computational Complexity of the Capacitated Lot Size Problem
- LP-based heuristics for the capacitated lot-sizing problem: The interaction of model formulation and solution algorithm
- A probabilistic scheduling period inventory model for deteriorating items with lead time
- Manufacturing systems with random breakdowns and deteriorating items