Tactical production and lot size planning with lifetime constraints: a comparison of model formulations
From MaRDI portal
Publication:4595321
Recommendations
- Modeling and solving the constrained multi-items lot-sizing problem with time-varying setup cost
- Uncapacitated two-level lot-sizing
- Dynamic economic lot size model with perishable inventory and capacity constraints
- An extension of the multi-machine multi-level proportional lot sizing and scheduling model for product-life-cycle demand
- The capacitated lot-sizing problem with linked lot sizes
Cites work
- scientific article; zbMATH DE number 5017341 (Why is no real title available?)
- A linear description of the discrete lot-sizing and scheduling problem
- A probabilistic scheduling period inventory model for deteriorating items with lead time
- Capacitated lot-sizing with sequence dependent setup costs
- Computational Complexity of the Capacitated Lot Size Problem
- Deterministic Production Planning: Algorithms and Complexity
- Dynamic economic lot size model with perishable inventory
- Integrating deterioration and lifetime constraints in production and supply chain planning: a survey
- LP-based heuristics for the capacitated lot-sizing problem: The interaction of model formulation and solution algorithm
- Lot-size models with backlogging: Strong reformulations and cutting planes
- Manufacturing systems with random breakdowns and deteriorating items
- Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction
- Meta-heuristics for dynamic lot sizing: a review and comparison of solution approaches
- Mixed integer programming model formulations for dynamic multi-item multi-level capacitated lotsizing
- Modelling practical lot-sizing problems as mixed-integer programs
- Period decompositions for the capacitated lot sizing problem with setup times
- Simultaneous lotsizing and scheduling by combining local search with dual reoptimization
- Solving Multi-Item Capacitated Lot-Sizing Problems Using Variable Redefinition
- Strong Formulations for Multi-Item Capacitated Lot Sizing
- The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times
- bc — prod: A Specialized Branch-and-Cut System for Lot-Sizing Problems
Cited in
(1)
This page was built for publication: Tactical production and lot size planning with lifetime constraints: a comparison of model formulations
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4595321)