Tactical production and lot size planning with lifetime constraints: a comparison of model formulations
From MaRDI portal
Publication:4595321
DOI10.1142/S0217595917500191zbMATH Open1379.90002OpenAlexW2733382332MaRDI QIDQ4595321FDOQ4595321
Andrea Raiconi, Stefan Voß, Julia Pahl, Raffaele Cerulli, Monica Gentili
Publication date: 30 November 2017
Published in: Asia-Pacific Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1142/s0217595917500191
Recommendations
- Modeling and solving the constrained multi-items lot-sizing problem with time-varying setup cost
- Uncapacitated two-level lot-sizing
- Dynamic economic lot size model with perishable inventory and capacity constraints
- An extension of the multi-machine multi-level proportional lot sizing and scheduling model for product-life-cycle demand
- The capacitated lot-sizing problem with linked lot sizes
Cites Work
- Modelling Practical Lot-Sizing Problems as Mixed-Integer Programs
- Deterministic Production Planning: Algorithms and Complexity
- Mixed integer programming model formulations for dynamic multi-item multi-level capacitated lotsizing
- Capacitated lot-sizing with sequence dependent setup costs
- Simultaneous lotsizing and scheduling by combining local search with dual reoptimization
- Integrating deterioration and lifetime constraints in production and supply chain planning: a survey
- Dynamic Economic Lot Size Model with Perishable Inventory
- Solving Multi-Item Capacitated Lot-Sizing Problems Using Variable Redefinition
- LP-based heuristics for the capacitated lot-sizing problem: The interaction of model formulation and solution algorithm
- A probabilistic scheduling period inventory model for deteriorating items with lead time
- Manufacturing systems with random breakdowns and deteriorating items
- Computational Complexity of the Capacitated Lot Size Problem
- The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times
- Lot-size models with backlogging: Strong reformulations and cutting planes
- Strong Formulations for Multi-Item Capacitated Lot Sizing
- Meta-heuristics for dynamic lot sizing: a review and comparison of solution approaches
- bc — prod: A Specialized Branch-and-Cut System for Lot-Sizing Problems
- Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction
- Period Decompositions for the Capacitated Lot Sizing Problem with Setup Times
- A linear description of the discrete lot-sizing and scheduling problem
- Title not available (Why is that?)
Cited In (1)
Uses Software
This page was built for publication: Tactical production and lot size planning with lifetime constraints: a comparison of model formulations
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4595321)