Lot sizing and scheduling for companies with tooling machines
From MaRDI portal
Publication:4596492
DOI10.1007/978-3-319-55702-1_64zbMATH Open1375.90013OpenAlexW2738752968MaRDI QIDQ4596492FDOQ4596492
Authors: Florian Isenberg, Leena Suhl
Publication date: 1 December 2017
Published in: Operations Research Proceedings 2016 (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/978-3-319-55702-1_64
Recommendations
- Dynamic lot sizing and tool management in automated manufacturing systems
- Lot sizing and scheduling -- survey and extensions
- Conceptual framework for lot-sizing and scheduling of flexible flow lines
- Lot-sizing and scheduling for flexible flow lines.
- Multi-level, single-machine lot sizing and scheduling (with initial inventory)
Cited In (1)
This page was built for publication: Lot sizing and scheduling for companies with tooling machines
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4596492)