On optimal operational sequence of components in a warm standby system
From MaRDI portal
Publication:4611265
Abstract: We consider an open problem of optimal operational sequence for the -out-of- system with warm standby. Using the virtual age concept and the cumulative exposure model, we show that the components should be activated in accordance with the increasing sequence of their lifetimes. Lifetimes of the components and the system are compared with respect to the stochastic precedence order. Only specific cases of this optimal problem were considered in the literature previously.
Recommendations
Cites work
- scientific article; zbMATH DE number 3591262 (Why is no real title available?)
- A complex discrete warm standby system with loss of units
- Accelerated Testing
- Accelerated life models: modeling and statistical analysis
- Cold vs. hot standby mission operation cost minimization for 1-out-of-\(N\) systems
- Failure rate modeling for reliability and risk
- General standby allocation in series and parallel systems
- Modelling a general standby system and evaluation of its performance
- Relations between stochastic orderings and generalized stochastic precedence
- Stochastic dominance and statistical preference for random variables coupled by an Archimedean copula or by the Fréchet-Hoeffding upper bound
- Stochastic modeling for reliability. Shocks, burn-in and heterogeneous populations
- Stochastic orders
- The Hazard Potential
- The stochastic precedence ordering with applications in sampling and testing
Cited in
(9)- Improving the bridge structure by using linear failure rate distribution
- Allocations of cold standbys to series and parallel systems with dependent components
- Rejoinder to: ``Virtual age, is it real?
- Optimal completed work dependent loading of components in cold standby systems
- A <scp>copula‐based</scp> approach on optimal allocation of hot standbys in series systems
- Optimal redundancy allocation in coherent systems with heterogeneous dependent components
- Stochastic precedence and minima among dependent variables
- Cold vs. hot standby mission operation cost minimization for 1-out-of-\(N\) systems
- Characterizations of lifetime distributions using two relative reliability measures
This page was built for publication: On optimal operational sequence of components in a warm standby system
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4611265)