On a random lead time and threshold shock model using phase‐type geometric processes
From MaRDI portal
Publication:4627139
DOI10.1002/asmb.2308zbMath1410.90073OpenAlexW2790495508MaRDI QIDQ4627139
Publication date: 7 March 2019
Published in: Applied Stochastic Models in Business and Industry (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1002/asmb.2308
Time series, auto-correlation, regression, etc. in statistics (GARCH) (62M10) Reliability, availability, maintenance, inspection in operations research (90B25)
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Geometric processes and replacement problem
- Optimal order-replacement policy for a phase-type geometric process model with extreme shocks
- Optimal replacement policy for a deteriorating system with increasing repair times
- A shock model for the maintenance problem of a repairable system
- A phase-type geometric process repair model with spare device procurement and repairman's multiple vacations
- Shock models and wear processes
- A \(\delta\)-shock maintenance model for a deteriorating system
- A summary of replacement models with changing failure distributions
- General shock models associated with correlated renewal sequences
- Distribution properties of the system failure time in a general shock model
- Optimal strategies for some repair replacement models
- Optimum replacement of a system subject to shocks
- A note on the optimal replacement problem
- Optimal Number of Minimal Repairs before Replacement
- Optimal Replacement for Shock Models with General Failure Rate
- An optimal repairable replacement model for deteriorating systems
- Replacement models under additive damage
- Optimal stopping in a semi-Markov shock model
- Nonparametric inference for geometric processes
- A reliability semi-Markov model involving geometric processes
- Optimal replacement policy for a general geometric process model with δ-shock
- A geometric process repair model for a two-component system with shock damage interaction
This page was built for publication: On a random lead time and threshold shock model using phase‐type geometric processes