Minimizing total completion time in a two-machine flowshop: Analysis of special cases
From MaRDI portal
Publication:4645936
Recommendations
- Minimizing total completion time in a two-machine flowshop: Analysis of special cases
- Two-machine flow-shop scheduling problems with minimizing the total completion times
- Minimizing total completion time in two-machine flow shops with exact delays
- Minimizing Total Completion Time in Two-Machine Flow Shops with Exact Delays
- Total completion time minimization in two-machine flow shop scheduling problems with a fixed job sequence
- Lower bounds for minimizing total completion time in a two-machine flow shop
- A SIMPLE LOWER BOUND FOR TOTAL COMPLETION TIME MINIMIZATION IN A TWO-MACHINE FLOWSHOP
- Minimizing the total flow time and the tardiness in a two-machine flow shop
- Minimizing total completion time in two-stage hybrid flow shop with dedicated machines
- Two-machine flowshop scheduling problem with bounded processing times to minimize total completion time
Cites work
- scientific article; zbMATH DE number 3639144 (Why is no real title available?)
- scientific article; zbMATH DE number 2146482 (Why is no real title available?)
- Flowshop and Jobshop Schedules: Complexity and Approximation
- Minimizing the sum of the job completion times in the two-machine flow shop by Lagrangian relaxation
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Stronger Lagrangian bounds by use of slack variables: Applications to machine scheduling problems
Cited in
(9)- Minimizing total completion time in a two-machine flowshop: Analysis of special cases
- Minimizing Mean Completion Time for Special Flowshop Problems
- Minimizing Total Completion Time in Two-Machine Flow Shops with Exact Delays
- Minimizing the total weighted completion time in a two-machine proportionate flow shop with different machine speeds
- Minimizing total completion time in two-machine flow shops with exact delays
- scientific article; zbMATH DE number 4074798 (Why is no real title available?)
- Formulating a scheduling problem with almost identical jobs by using positional completion times
- Two-machine flow-shop scheduling with equal processing time on the second machine for minimizing total weighted completion time
- An asymptotic two-phase algorithm to minimize total flow time for a two-machine flowshop
This page was built for publication: Minimizing total completion time in a two-machine flowshop: Analysis of special cases
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4645936)