A new algorithm for the open-pit mine production scheduling problem
From MaRDI portal
Publication:4648250
DOI10.1287/OPRE.1120.1050zbMATH Open1260.90087OpenAlexW2100769519WikidataQ57707471 ScholiaQ57707471MaRDI QIDQ4648250FDOQ4648250
Authors: Renaud Chicoisne, Marcos Goycoolea, Eduardo Moreno, Enrique Rubio, Daniel G. Espinoza
Publication date: 8 November 2012
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/opre.1120.1050
Recommendations
- Production scheduling for strategic open pit mine planning: a mixed-integer programming approach
- Publication:4887840
- A strengthened formulation and cutting planes for the open pit mine production scheduling problem
- Tailored Lagrangian relaxation for the open pit block sequencing problem
- Large-scale multi-period precedence constrained knapsack problem: a mining application
Cited In (42)
- Linear models for stockpiling in open-pit mine production scheduling problems
- Production planning and scheduling in mining scenarios under IPCC mining systems
- Multi-objective short-term production scheduling for open-pit mines: a hierarchical decomposition-based algorithm
- A real-world mine excavators timetabling methodology in open-pit mining
- Integrated optimization model of multi-period open-pit mine production scheduling
- Optimization-based heuristics for underground mine scheduling
- A study of the Bienstock-Zuckerberg algorithm: applications in mining and resource constrained project scheduling
- A hybrid method based on linear programming and variable neighborhood descent for scheduling production in open-pit mines
- Solution procedures for block selection and sequencing in flat-bedded potash underground mines
- Optimizing the open pit-to-underground mining transition
- Long term production planning of open pit mines by ant colony optimization
- Large-scale multi-period precedence constrained knapsack problem: a mining application
- Optimization of open-pit mine design and production planning with an improved floating cone algorithm
- Evolutionary approach for large-scale mine scheduling
- A sliding time window heuristic for open pit mine block sequencing
- Practical performance of an open pit mine scheduling model considering blending and stockpiling
- An application of branch and cut to open pit mine scheduling
- The new Fundamental Tree Algorithm for production scheduling of open pit mines
- LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity
- Production scheduling for strategic open pit mine planning: a mixed-integer programming approach
- Title not available (Why is that?)
- Hyper-heuristic approaches for strategic mine planning under uncertainty
- Aggregation heuristic for the open-pit block scheduling problem
- Network-flow based algorithms for scheduling production in multi-processor open-pit mines accounting for metal uncertainty
- Solving LP relaxations of large-scale precedence constrained problems
- Tailored Lagrangian relaxation for the open pit block sequencing problem
- MineLib: a library of open pit mining problems
- Hierarchical benders decomposition for open-pit mine block sequencing
- The precedence constrained knapsack problem: separating maximally violated inequalities
- A dynamic-material-value-based decomposition method for optimizing a mineral value chain with uncertainty
- Optimizing a mineral value chain with market uncertainty using Benders decomposition
- A strengthened formulation and cutting planes for the open pit mine production scheduling problem
- Optimizing high-level nuclear waste disposal within a deep geologic repository
- Concurrent open-pit mine production and in-pit crushing–conveying system planning
- Optimizing long-term production plans in underground and open-pit copper mines
- A local branching heuristic for the open pit mine production scheduling problem
- A decomposition-based heuristic for collaborative scheduling in a network of open-pit mines
- A recursive time aggregation-disaggregation heuristic for the multidimensional and multiperiod precedence-constrained knapsack problem: an application to the open-pit mine block sequencing problem
- A duality-based derivation of the maximum flow formulation of the open-pit design problem
- Optimization Strategies for Resource-Constrained Project Scheduling Problems in Underground Mining
- Effective solution of the long-term open pit production planning problem using block clustering
- Comparative analysis of three metaheuristics for short-term open pit block sequencing
This page was built for publication: A new algorithm for the open-pit mine production scheduling problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4648250)