Technical Note—A Note on the Structure of Joint Inventory-Pricing Control with Leadtimes

From MaRDI portal
Publication:4648254

DOI10.1287/opre.1120.1052zbMath1260.90023OpenAlexW2166199188MaRDI QIDQ4648254

Youyi Feng, Zhan Pang, Youhua (Frank) Chen

Publication date: 8 November 2012

Published in: Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1287/opre.1120.1052




Related Items (21)

M-Convexity and Its Applications in OperationsProduction planning and pricing policy in a make-to-stock system with uncertain demand subject to machine breakdownsRevenue management for operations with urgent ordersDynamic pricing and inventory management with demand learning: a Bayesian approachResearch on two-level price-fluctuation supply chain ordering strategy problemCOORDINATED PRICING AND INVENTORY CONTROL WITH BATCH PRODUCTION AND ERLANG LEADTIMESOptimal replenishment and transshipment management with two locationsInstantaneous Control of Brownian Motion with a Positive Lead TimeStocking and pricing decisions under endogenous demand and reference point effectsJoint Pricing and Inventory Management with Strategic CustomersQuality and pricing decisions in production/inventory systemsInventory rotation of medical supplies for emergency responseAssemble-to-order systems: a reviewA Variant of L-Convexity and its Application to Inventory Models with Batch OrderingA new approach to two-location joint inventory and transshipment control via $L^{\text{natural}}$-convexitySome specially structured assemble-to-order systemsPreservation of Structural Properties in Optimization with Decisions Truncated by Random Variables and Its ApplicationsTechnical Note—Error Noted in “Order-Based Cost Optimization in Assemble-to-Order Systems” by Lu and Song (2005)The secretary problem with multiple job vacancies and batch candidate arrivalsCoordinating Inventory Control and Pricing Strategies for Perishable ProductsOn properties of discrete \((r,q)\) and \((s,T)\) inventory systems







This page was built for publication: Technical Note—A Note on the Structure of Joint Inventory-Pricing Control with Leadtimes