scientific article; zbMATH DE number 2156731
From MaRDI portal
Publication:4669304
Recommendations
- A new decomposition approach for non-cyclic continuous material flow lines with a merging flow of material
- Exact analysis of a two-workstation one-buffer flow line with parallel unreliable machines
- A three-station merge system with unreliable stations and a shared buffer
- Approximate analysis of unreliable transfer lines with splits in the flow of material
- A continuous materials flow production line model with station breakdown
Cited in
(4)- A three-station merge system with unreliable stations and a shared buffer
- scientific article; zbMATH DE number 3987024 (Why is no real title available?)
- A new decomposition approach for non-cyclic continuous material flow lines with a merging flow of material
- A continuous materials flow production line model with station breakdown
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4669304)