Real-time due-date promising by build-to-order environments
From MaRDI portal
Publication:4671325
DOI10.1080/00207540410001716462zbMath1060.90045OpenAlexW2022950591MaRDI QIDQ4671325
No author found.
Publication date: 26 April 2005
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540410001716462
Related Items (5)
Control methods for dynamic time-based manufacturing under customized product lead times ⋮ Real-time prediction of order flowtimes using support vector regression ⋮ Development of a regression-based method with case-based tuning to solve the due date assignment problem ⋮ Dynamic capacity reservation and due date quoting in a make-to-order system ⋮ Managing product availability in an assemble-to-order supply chain with multiple customer segments
Cites Work
- Survey of scheduling research involving due date determination decisions
- Optimal due-date assignment and sequencing
- A due date assignment algorithm for multiproduct manufacturing facilities
- Scheduling and common due date assignment with earliness-tardiness penalties and batch delivery costs
- Due date assignment procedures with dynamically updated coefficients for multilevel assembly job shops
- A survey of the state-of-the-art of common due date assignment and scheduling research
- Optimal Lead Time Policies
- Optimal due-date assignment in a job shop†
- Setting Planned Leadtimes in Serial Production Systems with Tardiness Costs
- Approximations for the time spent in a dynamic job shop with applications to due-date assignment
- Integration of priority dispatching and due-date assignment in a job shop
- A Proof for the Queuing Formula: L = λW
- Due Date Assignment for Production Systems
- Due-Date Setting and Priority Sequencing in a Multiclass M/G/1 Queue
- A Broader View of the Job-Shop Scheduling Problem
- Due-Dates and Instantaneous Load in the One-Machine Shop
- A Simulation Study of Predictable Due-Dates
- Dynamic assignation of due-dates in an assembly shop based in simulation
- Integrating order release control with due-date assignment rules
- Due date demand management: Negotiating the trade-off between price and delivery
- Due-date assignment and early/tardy scheduling on identical parallel machines
- Regression-based due date assignment rules for improved assembly shop performance
- Due-date setting methodologies based on simulated annealing—an experimental study in a real-life job shop
- Optimal TWK-power due-date determination and sequencing
- Note: Due-date Assignment to Multi-Job Customer Orders
- Quoting Customer Lead Times
- Single Facility Due Date Setting with Multiple Customer Classes
This page was built for publication: Real-time due-date promising by build-to-order environments