Heuristics and sequence-dependent set-up jobs in flow line cells
From MaRDI portal
Publication:4706280
DOI10.1080/00207540210163973zbMath1064.90533MaRDI QIDQ4706280
T. T. Narendran, Vijayender Reddy
Publication date: 2003
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540210163973
90B35: Deterministic scheduling theory in operations research
90C59: Approximation methods and heuristics in mathematical programming
90B30: Production models
Related Items
Family-based dispatching: anticipating future jobs, Flow shop batching and scheduling with sequence-dependent setup times, A simultaneous and iterative approach for parallel machine scheduling with sequence-dependent family setups, A survey of scheduling problems with setup times or costs, The evolution of manufacturing cells: an action research study, Flexibility analysis of a surface mount technology electronic assembly plant: An integrated model using simulation, Using simulated annealing to schedule a flowshop manufacturing cell with sequence-dependent family setup times, Non-exhaustive family based dispatching heuristics–exploiting variances of processing and set-up times, A scatter search approach with dispatching rules for a joint decision of cell formation and parts scheduling in batches, Permutation and non-permutation schedules for the flowline manufacturing cell with sequence dependent family setups