A Stochastic Scheduling Problem with Intree Precedence Constraints
From MaRDI portal
DOI10.1287/OPRE.36.6.937zbMATH Open0679.90022OpenAlexW2112972836MaRDI QIDQ4729596FDOQ4729596
Authors: Esther Frostig
Publication date: 1988
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/opre.36.6.937
Recommendations
- On Stochastic Scheduling with In-Tree Precedence Constraints
- Scheduling Jobs with Exponentially Distributed Processing Times and Intree Precedence Constraints on Two Parallel Machines
- Stochastic Machine Scheduling with Precedence Constraints
- Scheduling precedence-constrained jobs with stochastic processing times on parallel machines
- Stochastic single machine scheduling problem with precedence constraints
Cited In (10)
- Stochastic Machine Scheduling with Precedence Constraints
- Optimal Scheduling on Parallel Processors with Precedence Constraints and General Costs
- A fully polynomial approximation scheme for a scheduling problem with intree-type precedence delays
- On Stochastic Scheduling with In-Tree Precedence Constraints
- Stochastic Scheduling with Variable Profile and Precedence Constraints
- On the asymptotic probabilistic analysis of scheduling problems in the presence of precedence constraints
- Effect of load, processing time and due date variation on the effectiveness of scheduling rules
- Predetermined intervals for start times of activities in the stochastic project scheduling problem
- Scheduling Jobs with Exponentially Distributed Processing Times and Intree Precedence Constraints on Two Parallel Machines
- Scheduling precedence-constrained jobs with stochastic processing times on parallel machines
This page was built for publication: A Stochastic Scheduling Problem with Intree Precedence Constraints
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4729596)