A dynamic intelligent decision approach to dependency modeling of project tasks in complex engineering system optimization
Summary: Complex engineering system optimization usually involves multiple projects or tasks. On the one hand, dependency modeling among projects or tasks highlights structures in systems and their environments which can help to understand the implications of connectivity on different aspects of system performance and also assist in designing, optimizing, and maintaining complex systems. On the other hand, multiple projects or tasks are either happening at the same time or scheduled into a sequence in order to use common resources. In this paper, we propose a dynamic intelligent decision approach to dependency modeling of project tasks in complex engineering system optimization. The approach takes this decision process as a two-stage decision-making problem. In the first stage, a task clustering approach based on modularization is proposed so as to find out a suitable decomposition scheme for a large-scale project. In the second stage, according to the decomposition result, a discrete artificial bee colony (ABC) algorithm inspired by the intelligent foraging behavior of honeybees is developed for the resource constrained multiproject scheduling problem. Finally, a certain case from an engineering design of a chemical processing system is utilized to help to understand the proposed approach.
- Scheduling interrelated activities in complex projects under high-order rework: a DSM-based approach
- Introducing multiobjective complex systems
- Applied mathematics modeling of intelligent mapping and scheduling of interdependent and multi-functional project resources.
- Modeling and simulation of project management through the PMBOK\(^{\circledR}\) standard using complex networks
- Simplifying multiproject scheduling problem based on design structure matrix and its solution by an improved aiNet algorithm
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems
- A genetic algorithm for multi-mode resource constrained project scheduling problem
- A genetic algorithm for the resource constrained multi-project scheduling problem
- Augmenting priority rule heuristics with justification and rollout to solve the resource-constrained project scheduling problem
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- Project scheduling with resource constraints: A branch and bound approach. Note by Frederik Kaefer
- Simplifying multiproject scheduling problem based on design structure matrix and its solution by an improved aiNet algorithm