Planning horizon procedures for machine replacement models with several possible replacement alternatives
From MaRDI portal
Publication:4740314
DOI10.1002/NAV.3800290310zbMATH Open0504.90030OpenAlexW2102354724MaRDI QIDQ4740314FDOQ4740314
Authors: Suresh Chand, Suresh P. Sethi
Publication date: 1982
Published in: Naval Research Logistics Quarterly (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1002/nav.3800290310
Applications of mathematical programming (90C90) Reliability, availability, maintenance, inspection in operations research (90B25) Dynamic programming (90C39)
Cited In (20)
- A variable neighborhood decomposition search method for supply chain management planning problems
- An optimal multi-machine replacement policy in a serially dependent production system
- Decision/forecast horizon results for a single facility dynamic location/relocation problem
- A 0-1 linear programming formulation for solving an equipment replacement problem
- A paradox in equipment replacement under technological improvement
- Computing minimal forecast horizons: an integer programming approach
- A concave cost multimachine replacement problem with an expected breakthrough.
- The Equipment Replacement Problem : A Simple Solution Technique
- Capacity expansion with alternative technology choices
- A concave cost stochastic replacement problem.
- A framework for replacement analysis
- On the upgrading policy after the redesign of a component for reliability improvement
- A linear programming formulation with integer solutions for solving an equipment replacement problem with multiple assets: the concave demand case
- A model for equipment replacement due to technological obsolescence
- Maintenance optimal control three-machine replacement model under technological breakthrough expectations
- Managing a portfolio of long term service agreements
- A survey of dynamic network flows
- Multiple asset replacement analysis under variable utilization and stochastic demand
- Infinite horizon optimality criteria for equipment replacement under technological change
- Integrating equipment investment strategy with maintenance operations under uncertain failures
This page was built for publication: Planning horizon procedures for machine replacement models with several possible replacement alternatives
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4740314)