Gated MaxWIP: A strategy for controlling multistage production systems
From MaRDI portal
Publication:4807209
DOI10.1080/00207540210128251zbMath1064.90524MaRDI QIDQ4807209
Abraham Grosfeld-Nir, Michael J. Magazine
Publication date: 2002
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540210128251
90B30: Production models
Related Items
CWIPL II, a mechanism for improving throughput and lead time in unbalanced flow line, Critical WIP loops: a mechanism for material flow control in flow lines
Cites Work