scientific article; zbMATH DE number 2119733
From MaRDI portal
Publication:4829007
zbMATH Open1093.68552MaRDI QIDQ4829007FDOQ4829007
Authors: April Rasala, Patchrawat Uthaisombut, Clifford Stein, Eric Torng
Publication date: 29 November 2004
Title of this publication is not available (Why is that?)
Recommendations
- On the existence of schedules that are near-optimal for both makespan and total weighted completion time
- Note: Bicriteria scheduling for minimizing flow time and maximum tardiness
- scientific article; zbMATH DE number 52239
- An improved lower bound for a bi-criteria scheduling problem
- Bicriteria scheduling with double due dates to minimize the maximum lateness
Cited In (14)
- Approximation algorithms for bicriteria scheduling problems on identical parallel machines for makespan and total completion time
- Maximizing set function formulation of two scheduling problems
- Approximation algorithms for the bi-criteria weighted MAX-CUT problem
- An improved lower bound for a bi-criteria scheduling problem
- Approximation algorithms for multi-agent scheduling to minimize total weighted completion time
- Bicriteria approximation algorithms for scheduling problems with communications delays
- Generalization of EDF and LLF: Identifying all optimal online algorithms for minimizing maximum lateness
- A note on scheduling to meet two min-sum objectives
- Two dimensional load balancing
- The constrained minimum weighted sum of job completion times problem
- Trading off worst and expected cost in decision tree problems
- A new approach for bicriteria partitioning problem
- Bi-objective matchings with the triangle inequality
- An almost tight lower bound for the scheduling problem to meet two min-sum objectives
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4829007)