Scheduling n Independent Jobs on m Uniform Machines with both Flowtime and Makespan Objectives: A Parametric Analysis
From MaRDI portal
Publication:4835449
DOI10.1287/IJOC.7.1.63zbMATH Open0822.90084OpenAlexW2000863312MaRDI QIDQ4835449FDOQ4835449
Authors: S. Thomas McCormick, Michael L. Pinedo
Publication date: 9 October 1995
Published in: ORSA Journal on Computing (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/ijoc.7.1.63
Recommendations
- Optimal preemptive scheduling on uniform machines with discounted flowtime objectives
- Preemptive scheduling on uniform machines to minimize mean flow time
- On the Minimization of the Makespan Subject to Flowtime Optimality
- Preemptive Scheduling of Uniform Machines by Ordinary Network Flow Techniques
- Minimizing Schedule Length Subject to Minimum Flow Time
Cited In (10)
- Two-agent scheduling on uniform parallel machines with min-max criteria
- Best compromise solution for a new multiobjective scheduling problem
- Optimal preemptive scheduling on uniform machines with discounted flowtime objectives
- The constrained minimum weighted sum of job completion times problem
- On the existence of schedules that are near-optimal for both makespan and total weighted completion time
- Multicriteria scheduling problems: a survey
- How Unsplittable-Flow-Covering Helps Scheduling with Job-Dependent Cost Functions
- Multicriteria scheduling
- Generating outpatient chemotherapy appointment templates with balanced flowtime and makespan
- Counting and enumeration complexity with application to multicriteria scheduling
This page was built for publication: Scheduling n Independent Jobs on m Uniform Machines with both Flowtime and Makespan Objectives: A Parametric Analysis
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4835449)