scientific article; zbMATH DE number 895359
From MaRDI portal
Publication:4883371
zbMATH Open0847.90079MaRDI QIDQ4883371FDOQ4883371
Publication date: 1 July 1996
Title of this publication is not available (Why is that?)
Cited In (8)
- On-line and off-line preemptive two-machine job shop scheduling
- Online scheduling of ordered flow shops
- On-line scheduling of small open shops
- New results on two-machine flow-shop scheduling with rejection
- On-line and semi-online scheduling for flow shop problems on two machines
- Complexity and approximation of open shop scheduling to minimize the makespan: a review of models and approaches
- Four decades of research on the open-shop scheduling problem to minimize the makespan
- On two-machine flow shop scheduling
Recommendations
- On-line scheduling of small open shops ๐ ๐
- On-line and semi-online scheduling for flow shop problems on two machines ๐ ๐
- A best possible on-line algorithm for two-machine flow shop scheduling to minimize makespan ๐ ๐
- On-line scheduling of two-machine open shops where jobs arrive over time ๐ ๐
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4883371)