scientific article; zbMATH DE number 903952
From MaRDI portal
Recommendations
- The discrete lot-sizing and scheduling problem
- scientific article; zbMATH DE number 4197717
- The discrete lot-sizing and scheduling problem with sequence-dependent setup costs
- A polyhedral approach to a production planning problem
- The multi-item capacitated lot-sizing problem with setup times and shortage costs
Cited in
(13)- Discrete multi-module capacitated lot-sizing problems with multiple items
- scientific article; zbMATH DE number 4197717 (Why is no real title available?)
- A Dual Ascent and Column Generation Heuristic for the Discrete Lotsizing and Scheduling Problem with Setup Times
- The flow shop scheduling polyhedron with setup times
- An evaluation of semidefinite programming based approaches for discrete lot-sizing problems
- Multi-product valid inequalities for the discrete lot-sizing and scheduling problem
- Integrative versus separate cycle scheduling heuristics for capacitated discrete lot sizing and sequencing problems
- A study of the lot-sizing polytope
- Remarks on: “Some Extensions of the Discrete Lotsizing and Scheduling Problem”
- Lot-sizing polyhedra with a cardinality constraint
- Polyhedra for lot-sizing with Wagner-Whitin costs
- Single item lot sizing problems
- A polynomial time algorithm for convex cost lot-sizing problems
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4885531)