Hybrid flowshop scheduling with interstage job transportation
DOI10.1007/S40305-014-0040-4zbMATH Open1308.90158OpenAlexW2056941025MaRDI QIDQ489104FDOQ489104
Authors: Wei-ya Zhong, Long-hua Lv
Publication date: 27 January 2015
Published in: Journal of the Operations Research Society of China (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s40305-014-0040-4
Recommendations
- Flowshop scheduling with interstage job transportation
- Two-machine flowshop scheduling with intermediate transportation under job physical space consideration
- A two-stage flow shop scheduling problem with transportation considerations
- A hybrid two-stage transportation and batch scheduling problem
- Two-Stage, Hybrid Flowshop Scheduling Problem
Deterministic scheduling theory in operations research (90B35) Combinatorial optimization (90C27) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20)
Cites Work
- The hybrid flow shop scheduling problem
- Integrated Production and Outbound Distribution Scheduling: Review and Extensions
- Machine scheduling with transportation considerations
- Optimal two- and three-stage production schedules with set-up time included
- Title not available (Why is that?)
- Two-machine flowshop scheduling with intermediate transportation under job physical space consideration
- Bounds for Certain Multiprocessing Anomalies
- Two-Stage, Hybrid Flowshop Scheduling Problem
- Scheduling algorithms for flexible flowshops: Worst and average case performance
- Analysis of Classes of Heuristics for Scheduling a Two-Stage Flow Shop with Parallel Machines at One Stage
- Scheduling Parts in a Combined Production-transportation Work Cell
- Title not available (Why is that?)
Cited In (6)
- Two-machine flowshop scheduling with intermediate transportation under job physical space consideration
- Flowshop scheduling with interstage job transportation
- A two-stage flow shop scheduling problem with transportation considerations
- Mathematical modelling and heuristic approaches to job-shop scheduling problem with conveyor-based continuous flow transporters
- Title not available (Why is that?)
- New complexity results on scheduling problem in a robotic cell
This page was built for publication: Hybrid flowshop scheduling with interstage job transportation
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q489104)