scientific article; zbMATH DE number 930117
From MaRDI portal
Publication:4894072
zbMATH Open0853.68063MaRDI QIDQ4894072FDOQ4894072
Authors: Zhi-Long Chen, Xiao-ping Zhao
Publication date: 2 January 1997
Title of this publication is not available (Why is that?)
Recommendations
Cited In (8)
- Title not available (Why is that?)
- Scheduling the two-machine open shop problem under resource constraints for setting the jobs
- A two-machine preemptive openshop scheduling problem: An elementary proof of NP-completeness
- Two machine open shop scheduling problem to minimize an arbitrary machine usage regular penalty function
- Two-Machine Open Shops with Renewable Resources
- TWO MACHINE OPEN SHOP SCHEDULING PROBLEM WITH CONTROLLABLE MACHINE SPEEDS
- Open shop unit-time scheduling problems with symmetric objective functions
- Open shop problem to minimize the total weighted completion time
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4894072)