Scheduling for fabrication and assembly in a two-machine flowshop with a fixed job sequence
From MaRDI portal
Publication:490158
DOI10.1007/S10479-014-1531-8zbMath1303.90048OpenAlexW2004604630MaRDI QIDQ490158
Bertrand M. T. Lin, Feng-Jang Hwang, Mikhail Y. Kovalyov
Publication date: 22 January 2015
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10479-014-1531-8
Related Items (4)
Relocation scheduling subject to fixed processing sequences ⋮ Survey and extensions of manufacturing models in two-stage flexible flow shops with dedicated machines ⋮ Two-machine flowshop scheduling with three-operation jobs subject to a fixed job sequence ⋮ Single-machine scheduling with supporting tasks
Cites Work
- Unnamed Item
- Total completion time minimization in two-machine flow shop scheduling problems with a fixed job sequence
- Batching decisions for assembly production systems
- Batch sizing and just-in-time scheduling with common due date
- Batching and scheduling in a multi-machine flow shop
- Two-machine flowshop batching and scheduling
- Optimal timing of a sequence of tasks with general completion costs
- Total completion time minimization in a \(2\)-stage differentiation flowshop with fixed sequences per job type
- Scheduling multi-operation jobs on a single machine
- Scheduling with batching: A review
- Scheduling the production of two-component jobs on a single machine
- Optimal two- and three-stage production schedules with setup times included
- Scheduling with centralized and decentralized batching policies in concurrent open shops
- Fifty years of scheduling: a survey of milestones
- The open shop scheduling problem with a given sequence of jobs on one machine
- Scheduling of Products with Common and Product-Dependent Components Manufactured at a Single Facility
- Handbook on Scheduling
- Scheduling
This page was built for publication: Scheduling for fabrication and assembly in a two-machine flowshop with a fixed job sequence