A robust optimization approach to assess the effect of delays in the connection-to-the-grid time of new generation power plants over transmission expansion planning
DOI10.1007/S10479-015-1833-5zbMATH Open1318.90053OpenAlexW1984167616MaRDI QIDQ492849FDOQ492849
Authors: Enzo Sauma, Fernando Traub, Jorge R. Vera
Publication date: 21 August 2015
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10479-015-1833-5
Recommendations
- Stochastic and minimum regret formulations for transmission network expansion planning under uncertainties
- A model and approach to the challenge posed by optimal power systems planning
- Climate-aware generation and transmission expansion planning: a three-stage robust optimization approach
- Robust transmission network expansion planning in energy systems: improving computational performance
- Robust Optimization for Power Systems Capacity Expansion under Uncertainty
Applications of mathematical programming (90C90) Stochastic programming (90C15) Minimax problems in mathematical programming (90C47)
Cites Work
- Robust optimization
- The Price of Robustness
- Robust Optimization of Large-Scale Systems
- Robust solutions of uncertain linear programs
- Technical Note—Convex Programming with Set-Inclusive Constraints and Applications to Inexact Linear Programming
- Adjustable robust solutions of uncertain linear programs
- A robust optimization approach to wine grape harvesting scheduling
- A simulated annealing genetic algorithm for the electrical power districting problem
- Integer Programming and Combinatorial Optimization
- Stochastic optimization for power system configuration with renewable energy in remote areas
- Robust Optimization for Power Systems Capacity Expansion under Uncertainty
- Computing robust basestock levels
Cited In (3)
This page was built for publication: A robust optimization approach to assess the effect of delays in the connection-to-the-grid time of new generation power plants over transmission expansion planning
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q492849)