scientific article; zbMATH DE number 1405789
From MaRDI portal
Publication:4938774
zbMath0946.90027MaRDI QIDQ4938774
Andreas S. Schulz, Marc Uetz, Frederik Stork, Rolf H. Möhring
Publication date: 23 February 2000
Title: zbMATH Open Web Interface contents unavailable due to conflicting licenses.
Deterministic scheduling theory in operations research (90B35) Numerical methods based on nonlinear programming (49M37)
Related Items (10)
Practical solutions for a dock assignment problem with trailer transportation ⋮ Computing redundant resources for the resource constrained project scheduling problem ⋮ Redundant cumulative constraints to compute preemptive bounds ⋮ Lower bounds for resource-constrained project scheduling problems. ⋮ On linear lower bounds for the resource constrained project scheduling problem. ⋮ An exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relations ⋮ Scheduling and constraint propagation ⋮ On project scheduling with irregular starting time costs ⋮ A linear programming and constraint propagation-based lower bound for the RCPSP ⋮ PERT scheduling with convex cost functions.
Uses Software
This page was built for publication: