Multi-objective routing and scheduling in flexible manufacturing systems under uncertainty
From MaRDI portal
(Redirected from Publication:4976119)
Recommendations
- Proposing a new mathematical model and a meta-heuristic algorithm for scheduling and allocating automated guided vehicle
- AGV scheduling optimization in mixed flexible manufacturing cell
- Vehicle scheduling in two-cycle flexible manufacturing systems
- scientific article; zbMATH DE number 978519
- A simulated multi-objective model for flexible job shop transportation scheduling
Cited in
(9)- Multimodal processes prototyping subject to grid-like network and fuzzy operation time constraints
- Proposing a new mathematical model and a meta-heuristic algorithm for scheduling and allocating automated guided vehicle
- A multi-objective vehicle routing and scheduling problem with uncertainty in customers' request and priority
- Joint production and transportation scheduling in flexible manufacturing systems
- Dissimilarity maximization method for real-time routing of parts in random flexible manufacturing Systems
- AGV scheduling optimization in mixed flexible manufacturing cell
- scientific article; zbMATH DE number 870411 (Why is no real title available?)
- Branch-and-price based heuristic algorithm for fuzzy multi-depot bus scheduling problem
- A six sigma based multi-objective optimization for machine grouping control in flexible cellular manufacturing systems with guide-path flexibility
This page was built for publication: Multi-objective routing and scheduling in flexible manufacturing systems under uncertainty
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4976119)