General flowshop scheduling problem with the sequence dependent setup times: a heuristic approach
From MaRDI portal
(Redirected from Publication:497626)
Recommendations
- Scheduling to minimize the sum of weighted flowtime and weighted tardiness of jobs in a flowshop with sequence-dependent setup times.
- A penalty-based heuristic algorithm for the permutation flowshop scheduling problem with sequence-dependent set-up times
- Heuristics for the flow line problem with setup costs
- A bicriteria \(m\)-machine flowshop scheduling with sequence-dependent setup times
- A bicriteria scheduling with sequence-dependent setup times
Cites work
- scientific article; zbMATH DE number 5345854 (Why is no real title available?)
- A bicriteria \(m\)-machine flowshop scheduling with sequence-dependent setup times
- A new constructive heuristic for the flowshop scheduling problem
- A penalty-based heuristic algorithm for the permutation flowshop scheduling problem with sequence-dependent set-up times
- A survey of scheduling problems with setup times or costs
- An iterated greedy heuristic for the sequence dependent setup times flowshop problem with makespan and weighted tardiness objectives
- Benchmarks for basic scheduling problems
- Heuristics for the flow line problem with setup costs
- Permutation vs. non-permutation flow shop schedules
- Solving the flowshop scheduling problem with sequence dependent setup times using advanced metaheuristics
- Worst-case and numerical analysis of heuristic algorithms for flowshop scheduling problems with a time-dependent learning effect
Cited in
(17)- scientific article; zbMATH DE number 4074791 (Why is no real title available?)
- A divide and merge heuristic for the multiprocessor scheduling problem with sequence dependent setup times
- The third comprehensive survey on scheduling problems with setup times/costs
- Integration of AI and OR Techniques in Constraint Programming for Combinatorial Optimization Problems
- Total flow time minimization in a flowshop sequence-dependent group scheduling problem
- A heuristic approach for a scheduling problem with periodic maintenance and sequence-dependent setup times
- Modeling and solving the flow-shop scheduling problem with sequence-dependent setup times by firefly algorithm (case study: automotive industry)
- A machine learning approach for flow shop scheduling problems with alternative resources, sequence-dependent setup times, and blocking
- An evolution strategy approach for the distributed permutation flowshop scheduling problem with sequence-dependent setup times
- No-wait flowshop scheduling problem with separate setup times to minimize total tardiness subject to makespan
- Scheduling to minimize the sum of weighted flowtime and weighted tardiness of jobs in a flowshop with sequence-dependent setup times.
- Enhanced migrating birds optimization algorithm for the permutation flow shop problem with sequence dependent setup times
- Solving the flowshop scheduling problem with sequence dependent setup times using advanced metaheuristics
- A penalty-based heuristic algorithm for the permutation flowshop scheduling problem with sequence-dependent set-up times
- An improved migrating birds optimisation for a hybrid flowshop scheduling with total flowtime minimisation
- An efficient heuristic based on machine workload for the flowshop scheduling problem with setup and removal
- Schedule generation schemes for the jop-shop problem with sequence-dependent setup times: dominance properties and computational analysis
This page was built for publication: General flowshop scheduling problem with the sequence dependent setup times: a heuristic approach
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q497626)