Complexity and approximation of single machine scheduling with an operator non-availability period to minimize total completion time
From MaRDI portal
(Redirected from Publication:497629)
Recommendations
- Single machine scheduling with an operator non-availability period to minimize total completion time
- Single-machine scheduling with operator non-availability to minimize total weighted completion time
- Two-machine flow shop scheduling with an operator non-availability period to minimize makespan
- An improved approximation algorithm for the single machine total completion time scheduling problem with availability constraints
- Scheduling resumable deteriorating jobs on a single machine with non-availability constraints
Cites work
- scientific article; zbMATH DE number 193053 (Why is no real title available?)
- An improved approximation algorithm for the single machine total completion time scheduling problem with availability constraints
- Fast approximation algorithms to minimize a special weighted flow-time criterion on a single machine with a non-availability interval and release dates
- Fully polynomial approximation schemes for a symmetric quadratic knapsack problem and its scheduling applications
- Improved algorithms for two single machine scheduling problems
- Improved approximation for non-preemptive single machine flow-time scheduling with an availability constraint
- Non-preemptive two-machine open shop scheduling with non-availability constraints
- One-Processor Scheduling with Symmetric Earliness and Tardiness Penalties
- Operator non-availability periods
- Scheduling with a position-weighted learning effect based on sum-of-logarithm-processing-times and job position
- Single machine flow-time scheduling with a single breakdown
- Single machine flow-time scheduling with scheduled maintenance
- Single machine scheduling with small operator-non-availability periods
- The single processor total weighted completion time scheduling problem with the sum-of-processing-time based learning model
- Unrelated parallel-machine scheduling with rate-modifying activities to minimize the total completion time
Cited in
(13)- Improved approximation for non-preemptive single machine flow-time scheduling with an availability constraint
- Single machine scheduling with small operator-non-availability periods
- High-multiplicity scheduling on one machine with forbidden start and completion times
- A binary multiple knapsack model for single machine scheduling with machine unavailability
- Single-machine scheduling with operator non-availability to minimize total weighted completion time
- Single machine scheduling with rejection and a non-availability interval to minimize the maximum delivery completion time plus the total rejection cost
- A lower bound for minimizing the total completion time of a three-agent scheduling problem
- Single machine scheduling with an operator non-availability period to minimize total completion time
- Two-machine flow shop scheduling with an operator non-availability period to minimize makespan
- Robust single machine scheduling with a flexible maintenance activity
- Efficient approximation schemes for the maximum lateness minimization on a single machine with a fixed operator or machine non-availability interval
- Single machine batch scheduling to minimize the sum of total flow time and batch delivery cost with an unavailability interval
- An improved approximation algorithm for the single machine total completion time scheduling problem with availability constraints
This page was built for publication: Complexity and approximation of single machine scheduling with an operator non-availability period to minimize total completion time
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q497629)