Unrelated parallel-machine scheduling problems with aging effects and deteriorating maintenance activities
From MaRDI portal
Publication:497936
DOI10.1016/J.INS.2013.08.053zbMATH Open1321.90056OpenAlexW2089832231MaRDI QIDQ497936FDOQ497936
Authors: Chou-Jung Hsu, Jia-Yuarn Guo, Dar-Li Yang, Min Ji
Publication date: 25 September 2015
Published in: Information Sciences (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ins.2013.08.053
Recommendations
- Unrelated parallel-machine scheduling with deterioration effects and deteriorating multi-maintenance activities for minimizing the total completion time
- Scheduling with deterioration effects and maintenance activities under parallel processors
- Unrelated parallel-machine scheduling with aging effects and multi-maintenance activities
- Minimizing the total completion time in single-machine scheduling with aging/deteriorating effects and deteriorating maintenance activities
- Single-machine scheduling with aging effects and optional maintenance activity considerations
Cites Work
- Title not available (Why is that?)
- Time-dependent scheduling
- Minimizing the total weighted completion time of deteriorating jobs
- A state-of-the-art review on scheduling with learning effects
- Scheduling Deteriorating Jobs on a Single Processor
- Minimizing maximum lateness under linear deterioration
- A concise survey of scheduling with time-dependent processing times
- Two-machine flow shop no-wait scheduling with machine maintenance
- Planning Machine Maintenance in Two-Machine Shop Scheduling
- Unrelated parallel-machine scheduling with rate-modifying activities to minimize the total completion time
- A note on the optimal sequence position for a rate-modifying activity under simple linear deterioration
- Scheduling problems with learning and ageing effects: a survey
- Minimizing the makespan in a single-machine scheduling problem with the cyclic process of an aging effect
- Scheduling a deteriorating maintenance activity on a single machine
- Worst-case and numerical analysis of heuristic algorithms for flowshop scheduling problems with a time-dependent learning effect
- Scheduling problems with two agents and a linear non-increasing deterioration to minimize earliness penalties
- Title not available (Why is that?)
- Single-machine scheduling with maintenance and repair rate-modifying activities
- Scheduling problems with general effects of deterioration and learning
- Multi-machine scheduling with deteriorating jobs and scheduled maintenance
- Minimizing the makespan with an availability constraint on a single machine under simple linear deterioration
- Scheduling deteriorating jobs subject to job or machine availability constraints
- Notes on ``Scheduling problems with general effects of deterioration and learning
- Scheduling linear deteriorating jobs to minimize makespan with an availability constraint on a single machine
- Scheduling linear deteriorating jobs with an availability constraint on a single machine
Cited In (18)
- Production, maintenance and resource scheduling: a review
- Single-machine scheduling problems with machine aging effect and an optional maintenance activity
- Single machine group scheduling with time dependent processing times and ready times
- Single machine common flow allowance scheduling with deteriorating jobs and a rate-modifying activity
- Unrelated parallel-machine scheduling with deterioration effects and deteriorating multi-maintenance activities for minimizing the total completion time
- A bicriteria approach for single machine scheduling with resource allocation, learning effect and a deteriorating maintenance activity
- Patient scheduling with deteriorating treatment duration and maintenance activity
- Parallel-machine scheduling with maintenance: praising the assignment problem
- Unrelated parallel-machine scheduling with deteriorating maintenance activities to minimize the total completion time
- Minimizing total earliness and tardiness for common due date single-machine scheduling with an unavailability interval
- Parallel-machine scheduling problems with past-sequence-dependent delivery times and aging maintenance
- Single-machine scheduling problems with job rejection, deterioration effects and past-sequence-dependent setup times
- Unrelated parallel-machine scheduling with controllable processing times and impact of deteriorating maintenance activities under consideration
- A lower bound for minimizing the total completion time of a three-agent scheduling problem
- Multi-machine preventive maintenance scheduling with imperfect interventions: a restless bandit approach
- Unrelated parallel-machine scheduling with aging effects and multi-maintenance activities
- An optimal machine maintenance problem with probabilistic state constraints
- Single-machine common flow allowance scheduling with aging effect, resource allocation, and a rate-modifying activity
This page was built for publication: Unrelated parallel-machine scheduling problems with aging effects and deteriorating maintenance activities
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q497936)