An optimization model and an algorithm for solving lot-sizing disassembly with multi-resource constraints
From MaRDI portal
Publication:4980650
zbMATH Open1299.90397MaRDI QIDQ4980650FDOQ4980650
Authors: Xiwang Guo, Shixin Liu
Publication date: 30 June 2014
Recommendations
- scientific article; zbMATH DE number 1784671
- KI 2005: Advances in Artificial Intelligence
- Integrated disassembly and reprocessing lot-sizing for multi-level structured products in remanufacturing systems
- Machine Scheduling for Multi-product Disassembly
- A Lagrangean heuristic algorithm for disassembly scheduling with capacity constraints
Problem solving in the context of artificial intelligence (heuristics, search strategies, etc.) (68T20) Approximation methods and heuristics in mathematical programming (90C59)
Cited In (11)
- Disassembly EOQ models with price-sensitive demands
- KI 2005: Advances in Artificial Intelligence
- Solving the disassembly-to-order problem using linear physical programming
- Optimizing the allocation of components to kits in small-lot, multiechelon assembly systems
- Model for the allocation of electronics components to reuse options
- An Outer Approximation Algorithm for Capacitated Disassembly Scheduling Problem with Parts Commonality and Random Demand
- Active snap-fit development using topology optimization
- Capacitated disassembly lot-sizing problem with disposal decisions for multiple product types with parts commonality
- Integrated disassembly and reprocessing lot-sizing for multi-level structured products in remanufacturing systems
- Title not available (Why is that?)
- A label correcting algorithm for partial disassembly sequences in the production planning for end-of-life products
Uses Software
This page was built for publication: An optimization model and an algorithm for solving lot-sizing disassembly with multi-resource constraints
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4980650)