Forecasting recoverable ore reserves and their uncertainty at Morila gold deposit, Mali: an efficient simulation approach and future grade control drilling
From MaRDI portal
Publication:500787
DOI10.1007/S11004-013-9478-XzbMATH Open1321.86041OpenAlexW1982966591MaRDI QIDQ500787FDOQ500787
Authors: Richard Peattie, Roussos Dimitrakopoulos
Publication date: 5 October 2015
Published in: Mathematical Geosciences (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s11004-013-9478-x
Recommendations
- Uncertainty integration in dynamic mining reserves
- Simulation of mineral grades with hard and soft conditioning data: application to a porphyry copper deposit
- Models for support and information effects: a comparative study
- Grade control classification of ore and waste: a critical review of estimation and simulation based procedures
- Conditional simulation for mineral resource classification and mining dilution assessment from the early 1990s to now
Cites Work
- Geostatistics. Modeling spatial uncertainty.
- Production scheduling with uncertain supply: a new solution to the open pit mining problem
- Generalized sequential Gaussian simulation on group size \(\nu\) and screen-effect approximations for large field simulations
- To be or not be\(\ldots\)stationary? That is the question
Cited In (6)
- A study of the influence of measurement volume, blending ratios and sensor precision on real-time reconciliation of grade control models
- A simulation-based geostatistical approach to real-time reconciliation of the grade control model
- A rapid updating method to predict grade heterogeneity at smaller scales
- Uncertainty integration in dynamic mining reserves
- Application of the QIBOFU method to mineral prognosis of the Guizhou lead and zinc mine
- Making use of online production data: sequential updating of mineral resource models
This page was built for publication: Forecasting recoverable ore reserves and their uncertainty at Morila gold deposit, Mali: an efficient simulation approach and future grade control drilling
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q500787)