A change point control chart for monitoring the production lead time based on sum of squared ranks
From MaRDI portal
Publication:5017237
zbMATH Open1488.62222MaRDI QIDQ5017237FDOQ5017237
Authors: Jianlan Zhong, Tian Jiang, Hong-Wei Zhao
Publication date: 17 December 2021
Recommendations
- Control Charts for the Mean and Variance based on Changepoint Methodology
- Nonparametric control chart based on change-point model
- Statistical process control for monitoring scheduling performance—addressing the problem of correlated data
- Estimation of the Change Point in Monitoring the Process Mean and Variance
- Estimation of the Change Point in theX¯andSControl Charts
Applications of statistics in engineering and industry; control charts (62P30) Queues and service in operations research (90B22)
This page was built for publication: A change point control chart for monitoring the production lead time based on sum of squared ranks
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5017237)