Erratum: a tight formulation for uncapacitated lot-sizing with stock upper bounds
From MaRDI portal
Publication:507343
DOI10.1007/s10107-016-0999-1zbMath1476.90212OpenAlexW2328249793MaRDI QIDQ507343
Publication date: 3 February 2017
Published in: Mathematical Programming. Series A. Series B (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10107-016-0999-1
Mixed integer programming (90C11) Production models (90B30) Combinatorial optimization (90C27) Inventory, storage, reservoirs (90B05)
Related Items (1)
Cites Work
- A note on ``Lot-sizing with fixed charges on stocks: the convex hull
- Polyhedral and Lagrangian approaches for lot sizing with production time windows and setup times
- An \(O(n^2)\) algorithm for lot sizing with inventory bounds and fixed costs
- Four equivalent lot-sizing models
- Lot-sizing with fixed charges on stocks: the convex hull
- Lot-sizing with production and delivery time windows
- Improved algorithms for a lot‐sizing problem with inventory bounds and backlogging
- Capacitated Multi-Item Lot-Sizing Problems with Time Windows
- Bounded Production and Inventory Models with Piecewise Concave Costs
- Lot Sizing with Inventory Bounds and Fixed Costs: Polyhedral Study and Computation
- Dynamic lot‐sizing model with production time windows
This page was built for publication: Erratum: a tight formulation for uncapacitated lot-sizing with stock upper bounds