An FPTAS for the parallel two-stage flowshop problem
From MaRDI portal
(Redirected from Publication:507441)
dynamic programmingmakespanmultiprocessor schedulingfully polynomial-time approximation schemetwo-stage flowshop scheduling
Approximation methods and heuristics in mathematical programming (90C59) Analysis of algorithms and problem complexity (68Q25) Deterministic scheduling theory in operations research (90B35) Dynamic programming (90C39) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20) Approximation algorithms (68W25)
Recommendations
- A polynomial-time approximation scheme for an arbitrary number of parallel two-stage flow-shops
- Approximation algorithms for the parallel flow shop problem
- A polynomial time approximation scheme for the two-stage multiprocessor flow shop problem
- Approximation algorithms for two-stage flexible flow shop scheduling
- An approximation scheme for minimizing the makespan of the parallel identical multi-stage flow-shops
Cites work
- scientific article; zbMATH DE number 3639144 (Why is no real title available?)
- scientific article; zbMATH DE number 1500536 (Why is no real title available?)
- scientific article; zbMATH DE number 2146482 (Why is no real title available?)
- A New Heuristic for Three-Machine Flow Shop Scheduling
- A polynomial time approximation scheme for the two-stage multiprocessor flow shop problem
- Algorithms for Scheduling Independent Tasks
- Analysis of Classes of Heuristics for Scheduling a Two-Stage Flow Shop with Parallel Machines at One Stage
- Approximability of flow shop scheduling
- Approximation algorithms for the parallel flow shop problem
- Flowshop and Jobshop Schedules: Complexity and Approximation
- Minimizing makespan in hybrid flowshops
- Optimal two- and three-stage production schedules with set-up time included
- Preemptive scheduling in a two-stage multiprocessor flow shop is NP-hard
- Scheduling a two-stage hybrid flow shop with parallel machines at the first stage
- Short Shop Schedules
- The Complexity of Flowshop and Jobshop Scheduling
- The hybrid flow shop scheduling problem
- Two-Stage, Hybrid Flowshop Scheduling Problem
Cited in
(24)- A polynomial-time approximation scheme for an arbitrary number of parallel two-stage flow-shops
- An approximation scheme for minimizing the makespan of the parallel identical multi-stage flow-shops
- A polynomial-time approximation scheme for parallel two-stage flowshops under makespan constraint
- Two-stage open-shop scheduling with a two-machine flow shop as a stage: approximation algorithms and empirical experiments
- On scheduling multiple two-stage flowshops
- FPTAS for the two identical parallel machine problem with a single operator under the free changing mode
- On Approximation Algorithms for Two-Stage Scheduling Problems
- Corrigendum to: ``An FPTAS for the parallel two-stage flowshop problem
- Scheduling on multiple two-stage flowshops with a deadline
- Approximation algorithms for the parallel flow shop problem
- Scheduling multiple two-stage flowshops with a deadline
- Maximizing total early work in a distributed two‐machine flow‐shop
- On scheduling inclined jobs on multiple two-stage flowshops
- A review and classification on distributed permutation flowshop scheduling problems
- A FPTAS for a two-stage hybrid flow shop problem and optimal algorithms for identical jobs
- Improved approximation algorithms for two-stage flowshops scheduling problem
- A PTAS for the Multiple Parallel Identical Multi-stage Flow-Shops to Minimize the Makespan
- On scheduling multiple parallel two-stage flowshops with Johnson's rule
- A multi-stage parallel-processor flowshop problem with minimum flowtime
- Scheduling two-stage jobs on multiple flowshops
- An effective Benders decomposition algorithm for solving the distributed permutation flowshop scheduling problem
- Applying Johnson's rule in scheduling multiple parallel two-stage flowshops
- A fully polynomial time approximation scheme for scheduling on parallel identical two-stage openshops
- A polynomial-time approximation scheme for an arbitrary number of parallel identical multi-stage flow-shops
This page was built for publication: An FPTAS for the parallel two-stage flowshop problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q507441)