A multiple warm standby repairable system under N-policy with multiple vacations following Markovian arrival process
DOI10.1080/03610926.2019.1710758OpenAlexW2998737212MaRDI QIDQ5077447FDOQ5077447
Authors: Baoliang Liu, Yanqing Wen, Qingan Qiu, Shugui Kang
Publication date: 18 May 2022
Published in: Communications in Statistics: Theory and Methods (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/03610926.2019.1710758
Recommendations
- A multiple warm standby δ-shock system with a repairman having multiple vacations
- A cold standby repairable system with the repairman having multiple vacations and operational, repair, and vacation times following phase-type distributions
- A multiple warm standby system with operational and repair times following phase-type distributions
- Complex multi-state systems modelled through marked Markovian arrival processes
- Instantaneous availability analysis of a repairable system with warm standbys and repairmen under vacations
Markov modelsphase-type distributionMarkovian arrival processmultiple vacationsmatrix-analytical approach
Cites Work
- Title not available (Why is that?)
- Fundamentals of matrix-analytic methods
- Shocks, runs and random sums
- \(\delta\)-shock model based on Polya process and its optimal replacement policy
- Two shock and wear systems under repair standing a finite number of shocks
- Recent advances in system reliability. Signatures, multi-state systems and statistical inference
- Phase-type software reliability model: parameter estimation algorithms with grouped data
- \(MAP/PH/1\) queue with working vacations, vacation interruptions and \(N\) policy
- Reliability evaluation of multi-component cold-standby redundant systems
- Shock and wear degradating systems under three types of repair
- Shock models under a Markovian arrival process
- A shock and wear model with dependence between the interarrival failures
- Reliability of a system under two types of failures using a Markovian arrival process
- A deteriorating system with its repairman having multiple vacations
- Title not available (Why is that?)
- Reliability analysis of a warm standby repairable system with priority in use
- A phase-type geometric process repair model with spare device procurement and repairman's multiple vacations
- The rate of occurrence of failures
- Optimal order-replacement policy for a phase-type geometric process model with extreme shocks
- Life distribution and its statistical properties of shock model with shock source
- Bivariate preventive maintenance of systems with lifetimes dependent on a random shock process
- A reliability system under cumulative shocks governed by a BMAP
- Heterogeneous standby systems with shocks-driven preventive replacements
- Reliability modeling for mutually dependent competing failure processes due to degradation and random shocks
- A multiple warm standby δ-shock system with a repairman having multiple vacations
- An LDQBD process under degradation, inspection, and two types of repair
- System availability in a shock model under preventive repair and phase-type distributions
- MAINTENANCE OF SYSTEMS BY MEANS OF REPLACEMENTS AND REPAIRS: THE CASE OF PHASE-TYPE DISTRIBUTIONS
Cited In (5)
- A MARKOV REPAIRABLE SYSTEM INVOLVING AN IMPERFECT SERVICE STATION WITH MULTIPLE VACATIONS
- A multiple warm standby δ-shock system with a repairman having multiple vacations
- Complex multi-state systems modelled through marked Markovian arrival processes
- State space splitting of a finite markov process and some discussions on related counting processes
- N-policy for redundant repairable system with multiple types of warm standbys with switching failure and vacation
This page was built for publication: A multiple warm standby repairable system under \(N\)-policy with multiple vacations following Markovian arrival process
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5077447)