Optimal design of one-sided exponential EWMA charts based on median run length and expected median run length
From MaRDI portal
Publication:5081033
Cites work
- A new nonparametric synthetic EWMA control chart for monitoring process mean
- A One-Sided EWMA Control Chart for Monitoring Process Means
- An optimal design of ewma control charts based on median run length
- Bounds for the Distribution of the Run Length of Geometric Moving Average Charts
- Counted Data CUSUM's
- CUSUM Charts with Variable Sampling Intervals
- Economic design of exponential charts for time between events monitoring
- scientific article; zbMATH DE number 3736680 (Why is no real title available?)
- Introduction to Matrix Analytic Methods in Stochastic Modeling
- Optimal design of synthetic np control chart based on median run length
- Optimal designs of multivariate synthetic \(|S|\) control chart based on median run length
- Optimal Statistical Design of a Multivariate EWMA Chart Based on ARL and MRL
- Optimization design of control charts based on Taguchi's loss function and random process shifts
- Some Omnibus Exponentially Weighted Moving Average Statistical Process Monitoring Schemes
- The Exact Run Length Distribution and Design of the Shewhart Chart with Estimated Parameters Based on Median Run Length
Cited in
(7)- A one-sided exponentially weighted moving average control chart for time between events
- The exponentiated exponentially weighted moving average control chart
- On the performance and comparison of various memory-type control charts
- A variable sampling interval EWMA control chart for urinary tract infections data
- An improved bisection-type algorithm for control chart calibration
- Design of a one-sided adaptive EWMA X̄ control chart using the truncation method in the presence of measurement errors
- Optimal design of modified one-sided EWMA gamma charts with estimated parameters based on the median run length
This page was built for publication: Optimal design of one-sided exponential EWMA charts based on median run length and expected median run length
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5081033)