Self-Starting control charts for monitoring logistic regression profiles
DOI10.1080/03610918.2018.1425442OpenAlexW2790839281WikidataQ130204751 ScholiaQ130204751MaRDI QIDQ5085977FDOQ5085977
Authors: Peyman Khosravi, Amirhossein Amiri
Publication date: 30 June 2022
Published in: Communications in Statistics. Simulation and Computation (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/03610918.2018.1425442
Recommendations
- Phase II monitoring of logistic regression profiles with estimated parameters
- Control Charts for the Log-Logistic Distribution
- Control chart based on likelihood ratio for monitoring linear profiles
- Self-concordant analysis for logistic regression
- Control charts based on quasi-likelihood estimation for monitoring profiles
- Self-starting control chart for simultaneously monitoring process mean and variance
- Self-adapting control charts
- Profile control charts based on nonparametric \(L-1\) regression methods
average run length (ARL)short-run processbinomial response variablelogistic regression profileself-starting control chart
Cites Work
- Introduction to linear regression analysis.
- Self-starting control chart for simultaneously monitoring process mean and variance
- Phase I Monitoring of Polynomial Profiles
- Nonparametric control chart for monitoring profiles using change point formulation and adaptive smoothing
- Control chart based on likelihood ratio for monitoring linear profiles
- Diagnosis aids in multivariate multiple linear regression profiles monitoring
Cited In (6)
- A new approach for monitoring healthcare performance using generalized additive profiles
- An economic-statistical design of simple linear profiles with multiple assignable causes using a combination of MOPSO and RSM
- A spatial rank-based EWMA chart for monitoring linear profiles
- Aggregated parameter update schemes for monitoring binary profiles
- Multi-objective economic-statistical design of simple linear profiles using a combination of NSGA-II, RSM, and TOPSIS
- Monitoring exponentially distributed time between events data: self-starting perspective
This page was built for publication: Self-Starting control charts for monitoring logistic regression profiles
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5085977)